Conservation Plans and Agreements




Habitat Conservation Plan

Data Definitions

Title
PG&E Metcalf - El Patio, Metcalf -Hicks/Vasona LE HCP
USFWS Region(s)
8
USFWS Field Office(s)
Sacramento Fish And Wildlife Office
Permits
TE160342-0
Status
I
NEPA Process
categorical exclusion
Involved Agency
USFWS
  • Date Information
  • Date Assistance Initiated
    10/2003
    Date Application Received
    No info
    Date of Notice of Intent to Prepare an EIS
    ---
    Date Noticed in Federal Register
    05/15/2007
    Date Permit Issued
    08/10/2007
    Date Application Withdrawn
    ---
    Date Permit Expired
    ---
    Date Permit Denied
    ---
    Date Permit Suspended
    ---
    Date Permit Revoked
    ---
  • Area Description Information
  • Location
    Central Santa Clara County, California. HCP plan area is divided into two linear sites. The two linear sites include the footprint of the PG&E Metcalf El Patio 115kV transmission line and Metcalf Hicks/Vasona 230kV transmission line within Santa Teresa Park and on Tulare Hill.
    Listed Species
  • Butterfly, bay checkerspot - (Euphydryas editha bayensis) Entire T
  • Non-Listed Species
    No non-listed species
    Habitat
    Rolling hills dominated by native serpentine grasslands, non-native annual grasslands, oak woodlands, oak savannah, coastal sage scrub, serpentine coastal sage scrub, and riparian habitats.
    States
  • California
  • Size (Total Area Covered, by State)
  • 39.5 acres (California)
  • Enrolled Size (Total Area Enrolled, by State)
    Data not available
    Encompassed Planning Area? (by state)
  • No
  • Acreage Protected
    1 acres
    Acreage Created/Enhanced/Restored
    0 acres
    Acreage Adversely Affected
    2 acres
  • Other Information
  • Applicant Type
    corporation
    Land Use
    utility/infrastructure
    Duration
    3 years, 0 months
    Reporting Frequency
    A post-construction compliance report will be prepared by the monitoring biologist within 60 calendar days of projected completion.
    Report Received Date(s)
    No info
    Monitoring Notes
    No info
    Additional Notes
    PG&E will satisfy thier mitigation requirements by purchasing and permanently protecting at least 1.2 acres of suitable bay checkerspot butterfly habitat within six months of constructing the project. Project construction started in Aug 2007.
    Plan/Agreement Documents
    No info
    Federal Register Documents
    No info

    Report generated on: February 12, 2016
    Select a Different HCP